Request for Quotes for the Rehabilitation Services

RFQ N0:  EYNPN/IOM/MMC/BOR/FEB/2025/0090 “REHABILITATION OF SOCIAL AND PRODUCTIVE INFRASTRUCTURES BASED ON COMMUNITY PREFERENCE IN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) ”

CLOSING DATE: 3rd March 2025, 5:00 PM

LOCATION: MMC

                                          ITEM / DISCRIPTION
              UNIT
    QUANTITY

Rehabilitation Of 3 Bedroom Fully Detached Flat with Waiting Area and Hall At Gidan Yara, Gidan Madara

Lumpsum
1

Rehabilitation Of 3 Bedroom Semi Detached Flat with Waiting Area

Lumpsum
1

Rehabilitation of 1 Block of 3 Classrooms and Painting of 1 Block Of 2 Classrooms at Gidan Yara, Gidan Madara

Lumpsum
1

Rehabilitation 0f 1 Block of 2 Rooms Kitchen at Gidan Yara, Gidan Madara

Lumpsum
1

Rehabilitation of 2 Block of Toilets at Gidan Yara, Gidan Madara

Lumpsum
1

Rehabilitation of Water Point at Gidan Yara, Gidan Madara

Lumpsum
1

Rehabilitation of one Bedroom Apartment at Gidan Yara, Gidan Madara

Lumpsum
1

 
 
 
 

To be considered, bidders should submit a completed request for quotation form and quotation on company’s letterhead not later than the closing date and time indicated above. Bidders     should ensure that the quotation is well written in English, easy to read, follows the instructions provided, and contains only requested information.

QUESTION: Any questions should be submitted in writing and emailed to procurements@eynprojects.org no later than three days after the issue date of this RFQ. No questions will be entertained if they are received by means other than the specified email address, and any communications to alternate e-mail addresses will result in the disqualification of the bidder.  The solicitation number (listed above) should be stated in the subject line. Answers will be compiled and distributed within 1 day from the closing date of questions

The Bidder is required to include details of three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.

EYN Projects reserves the right to visit the place of business of a prospective supplier to verify that it is a legal business entity and has the necessary organizational and management competence to fulfill the necessary responsibilities.

All Bidders must provide proof of registration and tax. Attach CAC certificate and TIN when sending quotation.
All transportation and handling charges if any should be incorporated into vendor’s quoted unit price.

DISCLAIMER: – Brand Names: Specific brands and / or models indicated—while often preferred—are for description only.  An equivalent substitute, as determined by the specifications, will be acceptable.

The EYN projects estimate that the rehabilitation will be delivered within a period of 714 days. The selected bidder(s) should have the capacity to provide the services needed by EYN projects within the aforementioned timeframe. The consumption range provided is an estimate, and EYN projects reserves the right to consume above or below this range, or to order partial Items, and the selected bidder(s) shall deliver accordingly. The selected bidder(s) must deliver the services according to the provided timeline.

TENDER REQUIREMENTS:  – 

To ensure that best value is obtained the following would be considered;

Evidence of Vendor’s registration with CAC, Tax Clearance Certificate and Identification Card (preferably NIN, International Passport or Voter’s card) of Company’ lead and Representation
Acceptable quotation validity period
Availability of items
Delivery within specified time
Not less than 3 years’ experience in similar services with Proof
The quotation is applicable to 3% withholding tax and 1% Stamp duty.

EVALUATION CRITERIA: BEST VALUE: – Only quotations that meet the requirements above would be selected for evaluation. Please note that if there are significant deficiencies regarding responsiveness to the requirements of this RFQ, an offer may be deemed “non-responsive” and thereby disqualified from consideration. EYN Projects reserves the right to waive immaterial deficiencies at its discretion

 

BOQ                                                                                REHABILITATION OF ONE BEDROOM APARTMENT AT GIDAN YARA, GIDAN MADARA

 
 
 
 
 
 

I
Sub Structure
 
 
Unit Price
Total Amount

 
Site Clearing
m2
15.00
 
 

 
Excavation of strip foundation of 1m width, to a suitable depth not exceeding 1m.
m
12.00
 
 

 
Excavate column base
m3
69.00
 
 

 
Treatment of foundation with anti termite Dieldrex
m2
20.00
 
 

 
Blinding for Strip Foundation 50mm bed
m3
0.60
 
 

 
Blinding for Column bases
m3
0.70
 
 

 
Column Base Reinforcements, Y12
kg
250.00
 
 

 
Striprups
Kg
158.00
 
 

 
Instu Plain Concrete
 
 
 
 

 
Foundation Strip/Footing
m3
1.00
 
 

 
Blockwork
 
 
 
 

 
Walls 230 Thick
m2
15.00
 
 

 
Reinforced; Instu Vibrated Concrete Grade 25 – 1:2:4
 
 
 
 

 
Column Bases
m3
1.00
 
 

 
Columns
m3
1.00
 
 

 
Bed not exceeding 150mm thick
m3
2.50
 
 

 
Formwork
 
 
 
 

 
Edge of Columns, beams and slab bed
m2
2.00
 
 

 
Laterite filling
 
 
 
 

 
Backfilling
m3
15.00
 
 

 
Hardcore
 
 
 
 

 
150mm thick
m3
15.00
 
 

 
Summary Substructure
 
 
 
 

 
 
 
 
 
 

II
Super Structure
 
 
 
 

 
Blockwork
 
 
 
 

 
Walls 230 Thick
m2
50.00
 
 

 
Reinforced; Instu Vibrated Concrete Grade 25 – 1:2:4
 
 
 
 

 
Column
m3
1.00
 
 

 
Lintels
m3
1.00
 
 

 
Roof Beam
m3
1.00
 
 

 
Reinforcement for Columns, Lintel and roof beams
Kg
300.00
 
 

 
Formwork
 
 
 
 

 

 
Sides of Columns, beams and Lintel
m2
1.00
 
 

 
Windows
 
 
 
 

 
Size 1200x1200mm
Nr
4.00
 
 

 
Door
 
 
 
 

 
Size 1200x2100mm
Nr
1.00
 
 

III                    Roofing

2×6                                                                            m           50.00

2×4                                                                            m           90.00

2×3                                                                            m           150.00

2×2                                                                            m           180.00

Roof covering pitch 10 degrees, 0.20CGI Zinc       m²          108.00

Finishes

Renderwalls                                                             m2        120.00

TILES

400 x 400 x 8mm Royal tiles or equal and approved bedded and jointed in cement and sand mortar (1:3) on screeded bed (measured separately) and pointed

in white   cement .

8mm Tiles Paving                                                     m2         46.00

100mm Skirting                                                        m           45.00

PAINTING AND DECORATING
 

 FinecoatProducts orEqual

 

Prepareand apply twocoats of emulsion paints on

Wall
m2         136.00

 

 

IV

 

 
Ceiling
m2
65.00
 
 

V
Electricals:
 
 
 
 

 
Allow provisional sum of
Lsum
1
 
 

 
 
 
 
 
 

VI
Builder’s works
 
 
 
 
 

 

 
Allowfor builder’s works in connection with all works in this section
sum
1
 
 

 
 

 
Summary Superstructure
 

 
 

GRAND TOTAL
 

 

BOQ

REHABILITATION OF 1 BLOCK OF 2 ROOMS KITCHEN AT GIDAN YARA, GIDAN MADARA

 
 
 
 
 
 

 
 
 
 
UNIT PRICE
TOTAL PRICE

I
FLOOR FINISHES
 
 
 
 

 
Cement and Sand (1:3) Beds &backing
 
 
 
 

 
42mm screeded bedding to Floor
m2
45.00
 
 

 
12mm backing to smooth finish
m2
45.00
 
 

 
 
 
 
 
 

II
DOORSAND WINDOWS
 
 
 
 

 
Supply and fix purpose made steel doors with complete with locks and frames
 
 
 
 

 
Size 900 X 2100mm high
Nr
2.00
 
 

 
WINDOWS
 
 
 
 

 
Supply and fix seethrough or fancy blocks  
 
 
 
 

 
Size 100 x 200mm
Nr
40.00
 
 

 
 
 
 
 
 

III
COOKING AREA
 
 
 
 

 
Allow Provisional sum for fixing of cooking area
LS
1.00
 
 

 
 
 
 
 
 

IV
ROOFCOVERING
 
 
 
 

 
Replace roofing sheets
Bundle
1.00
 
 

 
 
 
 
 
 

V
PAINTING AND DECORATING
 
 
 
 

 
Finecoat Products or Equal
 
 
 
 

 
Prepare and apply two coatsof emulsion paints on
 
 
 
 

 
Wall (External )
m2
80.00
 
 

 
Wall (Internal Halfway)
m2
80.00
 
 

 
Oil Paint
 
 
 
 

 
 
 
 
 
 

 
Prepare and apply two coatsof oil paints on
 
 
 
 

 
Wall (Halfway)
m2
80.00
 
 

 
 
 
 
 
 

 
 
 
 
 
 

VI
ELECTRICAL
 
 
 
 

 
Allow a provisional sum for electrical fittings
LS
1.00
 
 

 
 
 
 
 

VII
Builder’s works
 
 
 
 

 
Allowfor builder’s works in connection with all works in this section

 

sum

 

1

 
 

GRAND TOTAL

 

PRICING DOCUMENT

REHABILITATION OF 1 BLOCK OF 3 CLASSROOMS  ANDPAINTING OF 1 BLOCK OF 2

CLASSROOMS  AT GIDAN YARA, GIDAN MADARA

 

 

 
 
 
 
UNIT PRICE
TOTAL AMOUNT
 

I

FLOOR FINISHES

Cement and Sand (1:3) Beds & backing

 
 
 
 

 
 
 
 
 

 
42mm screeded bedding to Floor
m2 m2

30.00

 

 

45.00

 
 
 

 
12mm backing to smoothfinish
 
 
 

 
 
 
 
 
 
 

II
WINDOWS WINDOWS
 
 
 
 
 

 
 
 
 
 

 
Supply and fix glass on window Frame
 
 
 
 
 

 
Size 600 x 1200mm
Nr
2.00
 
 
 

 
 
 
 
 

III

ROOFCOVERING

Supply and Fix Ceiling

 
 
 
 
 

m2
60.00
 
 
 

 
 
 
 
 

IV

STEPS AND RAMP

Repair and fix steps and ramp

 
 
 
 
 

 
 
 
 
 

 
Steps
 
 
 
 
 

 
size 300 x 1000mm
LS
1.00
 
 
 

 
Ramp
 
 
 

 
Size 600 x 1000mm
LS
1.00
 
 
 

 
 
 
 
 

VI
PAINTING AND DECORATING Finecoat Products or Equal
 
 
 
 
 

 
 
 
 
 

 
Prepare and apply two coatsof emulsion paints on
 
 
 
 
 

 
Wall
m2
850.00
 
 

 
 
 
 
 
 

V
ELECTRICAL
 
 
 
 

 
Allow a provisional sum for electrical fittings
LS
1.00
 
 

 
 
 
 
 

VI
Builder’s works
 
 
 
 

 
Allow for builder’s works in connection with all works in this section

 

sum

 

1

 
 

GRAND TOTAL

 

BOQ

REHABILITATION OF 2 BLOCK OF TOILETS AT GIDAN YARA,GIDAN MADARA

I
FLOOR FINISHES
 
 
 
 

 
Cement and Sand (1:3) Beds & backing
 
 
 
 

 
42mm screeded bedding to Floor
m2
60.00
 
 

 
300x300mmTiles
m2
40.00
 
 

 
Wall
m2
20.00
 
 

 
 
 
 
 
 

II
WINDOWS AND DOORS
 
 
 
 

 
Windows
 
 
 
 

 
Supply and install purpose madesteel window   
 
 
 
 

 
Size 600 x 600mm
Nr
4.00
 
 

 
Doors
 
 
 
 

 
Supply and install purpose madesteel doors   
 
 
 
 

 
Size 900 x 2100mm
Nr
4.00
 
 

IV
STEPS AND RAMP
 
 
 
 

 
Repair and fix steps and ramp
 
 
 
 

 
Steps
 
 
 
 

 
size300 x 1000mm
LS
1.00
 
 

 
Ramp
 
 
 
 

 
Size 600 x 1000mm
LS
1.00
 
 

 
 
 
 
 
 

VI
PAINTING AND DECORATING
 
 
 
 

 
Finecoat Productsor Equal
 
 
 
 

 
Prepare and apply two coats of emulsion paints on
 
 
 
 

 
Wall
m2
180.00
 
 

 
Ceiling
m2
30.00
 
 

 
 
 
 
 
 

 
PLUMBING AND SANITARY FITTINGS
 
 
 
 

 
Allow for water connection to Toilet

Ls

 

Nr

1.00
 
 

 
Supply and installsquat water closet, washhand basinand all accessories

 

4.00

 
 

 
 
 
 
 

V
ELECTRICAL
 
 
 
 

 
Allow a provisional sum for electricalfittings
LS
1.00
 
 

 
 
 
 
 

VI
Builder’s works
 
 
 
 

 
Allow for builder’s works in connection with all works in this section

 

sum

 

1

 
 

GRAND TOTAL

BOQ

REHABILITATION OF3 BEDROOM FULLY DETACHED FLAT WITH WAITNG AREA AND HALLAT GIDAN YARA, GIDAN MADARA

 

I                      FLOOR FINISHES AND WALL TILES

Carefully Chiesel through surface of existing concrete floor to fix new tiles

m2         9.00

400 x 400 x 8mm Royal tiles or equal and approved   bedde d and  jointed in cement and sand mortar (1:3) on screeded bed (measured separately) and pointed in white   cement . 

8mm Tiles Paving                                                      m2         158.00

100mm Skirting                                                        m           231.00

Cement and Sand (1:3) Beds & backing

42mm screeded bedding to Quarry tiles                   m2         158.00

12mm backing toskirting                                         m           231.00

Wall Tiles at Toilet                                                   m2         40.00

II                     DOORS AND WINDOWS

Supply and fix wooden panel flush door for rooms and Turkish Door for entrance with complete  with  locks and frames 

Size 900 X 2100mm high                                          Nr         6.00

Size 1200 x 2100 in two openings leaves                 Nr          1.00

 
Fix exit door to Kitchen handles
Nr
1.00
 
 

 
WINDOWS
 
 
 
 
 

 

 
Supply and fix purpose made steel mosquitoes Nets
 
 
 
 

 

 
Size 1200 x 1200mm
Nr
16.00
 
 

 
Size 1800 x 600mm
Nr
3.00
 
 

 
Fix lovures glasses (200x800mm)
Nr
15.00
 
 

 
 
 
 
 
 

III
WARDROPES
 
 
 
 
 

 

 
Supply and Fix MDF wood or equivalent
 
 
 
 
 

wardropes
 

 

 
Size 1800 x 2100mm
Nr
1.00
 
 

 
Size 1400 x 2100mm
Nr
1.00
 
 

 
 
 
 
 
 

IV
WASTE DISPOSAL
 
 
 
 
 

 

 
Carefully break existing inspection chamber and dispose
LS
1.00
 
 

 

 

 

Construct 1 x 1 x2m chamber (using 6″ blocks

and block fill with lightconcrete – 1:6) plastered in and out. Also, install fabricated cover of 3mm

thick guage properly treated with anti-rust paint and install a big high quality steel pad locks. (sanitary seal)

 

 

 

 

LS

 

 

 

 

1.00

 
 

 
 
 
 
 
 

V
ROOF COVERING
 
 
 
 
 

 

 
Check for possible leaking and fix
LS
1.00
 
 

 
Replace ceiling board
m2
50.00
 
 

 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

VI
PAINTINGAND DECORATING
 
 
 
 
 

 

 
Finecoat Products or Equal
 
 
 
 
 

 

 
Prepare and apply two coats of emulsion paints
 
 
 
 

on
 

 

 
Wall
m2
520.00
 
 

 
Ceiling
m2
350.00
 
 

 
 
 
 
 
 

 
PLUMBING AND SANITARY FITTINGS
 
 
 
 

 
Supply and install water closet with wash hand basin at Director’s office
Nr
1.00
 
 

 
Supply and install squat water closet, wash hand basin and all accessories
Nr
2.00
 
 

 
 
 
 
 
 

VII
ELECTRICAL
 
 
 
 
 

 

 
Allow a provisional sum for electrical fittings
LS
1.00
 
 

 
 
 
 
 

 
PVC CEILING
 
 
 
 

 
Supply and Fix PVc Ceiling at Entrance
m2
180.00
 
 

 
 
 
 
 
 

 
OFFICEFURNITURE
 
 
 
 

 

Supply Standard Office Chair and Table for

Director’s office

Ls

 

Ls Ls

Nr

1.00
 
 

 
Supply and Install 42” Television
1.00
 
 

 
Supply and Install a decoder Free to Air
1.00
 
 

 
Supply and Install a 3 seater stainless steel chairs
3.00
 
 

 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 

VIII
Builder’s works
 
 
 
 
 

 

 
Allow for builder’s works in connection with all works in this section
sum
1
 
 

GRAND TOTAL

 

 

BOQ

REHABILITATION OF 3 BEDROOM SEMI DETACHED FLAT WITH WAITNG AREA

 

 

 
 
 
 
 
 
 

I

DOORS AND WINDOWS

Supply and fix wooden panel flushdoor for rooms and Turkish Door for entrance with complete with locks and frames

 
 
 
 
 

 
 
 
 
 

 
Size 900 X 2100mm high

Nr

 

Nr

5.00

 

1.00

 
 
 

 
Size 1200 x 2100 in two openings leaves
 
 
 

 
WINDOWS
 
 
 
 
 

 
Supply and fix purpose made steel mosquitoes Nets
 
 
 
 
 

 
Size 1200 x 1200mm

Nr

 

Nr

16.00

 

3.00

 
 
 

 
Size 1800 x 600mm
 
 
 

 
 
 
 
 
 
 

II
INFANT BEDS
 
 
 
 
 

 
 
 
 
 

 

Fix broken beds

 

Paint All infant beds using an approved oil paint

Nr

 

Nr

5.00

 

10.00

 
 
 

 
 
 
 

 
 
 
 
 
 
 

III

KITCHEN CABINETS

Size 600 x 1200 x 5000mm

 
 
 
 
 

Nr

 

Nr

1.00

 

1.00

 
 
 

 
Size600 x 1200 x 2000mm
 
 
 

 

IV
PAINTING AND DECORATING
 
 
 
 

 
Finecoat Products or Equal
 
 
 
 

 
Prepare and apply two coatsof emulsion paints on
 
 
 
 

 
Wall
m2
820.00
 
 

 
 
 
 
 
 

 
Ceiling
m2
450.00
 
 

 
 
 
 
 
 

V
OFFICEFURNITURE
 
 
 
 

 
Supply Standard Office Chair and Table for 2 offices
Ls
1.00
 
 

 
 
 
 
 
 

 
 
 
 
 
 

VI
ELECTRICAL
 
 
 
 

 
Allow a provisional sum for electrical fittings
LS
1.00
 
 

 
 
 
 
 

VII
Builder’s works
 
 
 
 

 
Allowfor builder’s works in connection with all works in this section

 

sum

 

1

 
 

GRAND TOTAL

 

PRICING DOCUMENT

REHABILITATION OF WATERPOINT AT GIDAN YARA,GIDAN MADARA

 
 
 
 
 
 

I
PLUMBIMG WORKS
 
 
UNIT PRICE
TOTAL AMOUNT

 
 
 
 
 
 

 

Supply  and install  15 length  of 1 1/4″ PVC pipe  (tiger  made),

10  pcs  of  PVC  elbow,  3  pcs  of  PVC  Tee,  4  pcs  of  PVC  gate valve  for washouts  and outlets  to the storage  reserviour.  This include cost of materials and labourfor installations.

 

 

LS

 

 

1.00

 
 

 
Construct a water collection point 2.5 X 3.0 X 1m, (LxBxH) plastered  completely  and install  2nos  1 1/4 “GI outlet  and a purpose  made  hanger  for  the  flexible  horse  tobe  hung.  Also supply  and install a 5m length  1 1/2″flexible  horse.  Note: the concrete platform for the water collection point should be compacted in layers of 0.15m laterite soil, boulders with 6″ concrete  thickness  (1:3:6,  aggregate  (2″  granite)),  sloping  at least  0.1m.  lay  one  course  of  9″  blocks  at  the  two  sides  and install two (2) purpose  made hangers  and plaster accordingly. The mansory stand for water outlets is 1m height.

 

 

 

 

 

 

LS

 

 

 

 

 

 

1.00

 
 

 
Supply all required materials and construct a 4meter length drainage  using   6″ hollow  blocks  to be laid in parrallel  6 inch apart,  every  line should  have   2 courses  of blocks  jointed  with cement  sand  mortar  (1:6)  embeded  on 50mm  blinding  as its foundation.      Internal     and    external    plastering      should    be applied    with   proper   dressing.This  is  to   connect    collection point to an existing drainage.

 

 

 

 

LS

 

 

 

 

1.00

 
 

 
Construct   1 x 1 x 1m chamber   (using  6″ blocks  andblock  fill with light concrete – 1:6) plastered in and out. Also, install  fabricated    cover  of  3mm  thick  guage  properly    treated  with anti-rust  paint  and    install  a big high  quality  steel  pad   locks. (sanitary seal)

 

 

LS

 

 

1.00

 
 

 

 

Excavate    an  area  2x2m  not  exceeding    0.9m,  blind  properly  with  6″ mass  concrete  (1:3:6).  Construct  a concrete  Platform

2.3  x 2.3  x 3 m  (LXBXH).  Using  9″  concrete  blocks  embeded with    colums   and   basket   (0.6×0.6m    ,Bottom)    @  2.3    meter centers  with  ground  and  top  beams  respectively. Filled  with lateritic  earth  materials   compacted   in  layers  of  0.3m  fillled with   boulders    and   layed   with    150    mm   (6″)   of   concrete thickness with steel bars 10mm diameter every 30cm with a concrete  cover  at the  top and buttom.  Also  plaster  the   entire  structure.  Install  4nos of a purpose  made hooks   using  12mm rod  as  support  for  ancoring  the  tank.  Note concrete  should

contain 3” granite as gravel .

 

 

 

 

 

 

 

Ls

 

 

 

 

 

 

 

1.00

 
 

 

Supply  and installation  of 5000  liters  PVC GEEPEE    tank  with

complete     assessories     for   the    connections.  Note:   the   tank should  be  anchored  to  the  hooks  using  8   mm  rod  to   avoid wind effect

 

 

Ls

 

 

1.00

 
 

 
 
 
 
 
 

 
 
 
 
 
 

GRAND TOTAL

 

 
 
 
 
 

 

 

RFQ # EYNPN/IOM/MMC/BOR/FEB/2025/0090

 

 

Request For Quotation (RFQ)

Programs Requisition                                            Date Prepared:  17/Feb/2025

 
 

 
 

 
 
 
 
 

Vendor Name:

 

Vendor’s Address:

 
 
 
 
 
 
 

 
 
 
 
 
 
 

Mobile Number:
 
 
 
 
 
 
 

Contact Person:
 
 
 
 
 
 
 

Delivery Date:
 
 
 
 
 
 
 

Delivery Location:
MMC
 

 
 

 

Activity Title:

 

Budget Code:

 

REHABILITATION OF SOCIAL AND PRODUCTIVE  INFRASTRUCTURES BASED ON COMMUNITY PREFERENCEIN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT)

 

 

 

 

ription and Specification (Be specific as possible )

 

Unit of Measure

 

 

Lumpsum

 

Qty            Freq

 

 

1                 1

 

Est Unit Cost

 

Est total

 

 

NGN                                   –

 

 

1

 
 

 

2

 
 

 

Lumpsum

 

1                 1

 

 

NGN                                   –

 

 

3

 

Rehabilitation of 1 Block of 3 Classrooms and Painting of 1 Block Of 2 Classrooms at

Gidan Yara, Gidan Madara

 

Lumpsum

 

1                 1

 

 

NGN                                   –

 

 

4

 

Rehabilitation 0f 1 Block of 2 Rooms Kitchen at Gidan Yara, Gidan Madara

 

Lumpsum

 

1                 1

 

 

NGN                                   –

 

 

5

 

Rehabilitation of 2 Block of Toilets at Gidan Yara, Gidan Madara

 

Lumpsum

 

1                 1

 

 

NGN                                   –

 

 

6

 

Rehabilitation of Water Point at Gidan Yara, Gidan Madara

 

Lumpsum

 

1                 1

 

 

NGN                                   –

 

 

7

 

Rehabilitation of one Bedroom Apartment at Gidan Yara, Gidan Madara

 

Lumpsum

 

1                 1

 

 

NGN                                   –

 

 
 
 
 
Estimated Total:
NGN                                   –
 

Note: Please submit your qoutation offer on or before the closingdate                                      End Date: 3/Mar/2025
 
 
 
 

 
 
 
 
 
 
 
 
 

 

To be completed  byvendor

 

Validaty period of quoatation  (in days, Weeks) :

 

 

How many days, can you deliver after PO is received) :
 

Warrantee  Period ( In weeks or Year(s) :
 

Disclaimer: I vendor, certify that information provided by my company are true, accurate and free of error and valid
 

Name of Company Representative:
 

 

 

Signature  with company  stamp here:

 

 

Date :

Quotations must be submitted in a sealed brown envelope to the designated bid box at the EYN Projects Office at Old GRA, No 1 Madura street, Old Doctors Quarters, Maiduguri, Borno State, Nigeria. Or via email to: tender@eynprojects.org with the subject line:  “ RFQ N0:  EYNPN/IOM/MMC/BOR/FEB/2025/0090 “REHABILITATION OF SOCIAL AND PRODUCTIVE INFRASTRUCTURES BASED ON COMMUNITY PREFERENCE IN SELECTED LOCATIONS (SOCIAL IMPACT PROJECT) ”

Apply via :

tender@eynprojects.org