Job ID: 651 Reporting to: Engineering Operations Manager Purpose/Role
To supplement current piping team who are under resourced.
Key Aims and Objectives
To annotate, correct & update pipework isometrics
To produce limit of state drawings for pre-commissioning & commissioning
Participate in the production of pre-commissioning and commissioning procedures
Participate in the update of the P&IDS and associated schematics for water treatment plant, MGO plant and new water wells.
Prime Responsibilities and Duties
Ensure that all drawings are code compliant
All valves, pull bend, fittings, flanges are to correct dimensions and rating
All pipe supports tie-in with pipe support stress analysis
Participate in pipe support design
Ensure all limits of system handover are correctly specified
Produce MTOs
Compile valve catalogue
Other Duties:
Liaise with DC with respect to installed pipework.
Key Internal Interfaces:
Lead pipe engineer
Piping designer
Structural designer
Job Requirements The Person:
Minimum of 8-10 years of experience within an oil and gas industry facilities
Degree in Mechanical / Piping Engineering with knowledge of the oil and gas fabrication industry.
Ability to demonstrate a complete understanding and show commitment to the importance of HSE and Quality in the activities within a fabrication facility.
Ability to take responsibility and accountability for department performance and to drive success through good leadership.
Good communication and organizational skills
Ability to lead and manage a team and to mentor and train others.
Mature, pro-active, willing to listen and has knowledge of Niger dock’s processes and procedures
Good knowledge of ASME B31.3
Apply via :
jagal.hua.hrsmart.com