Asphalt Batching Plant Foreman

Job Requirements and Duties

Must have a minimum of HND in Mechanical Engineering.
Candidate must have a minimum of 5 to 7 years concrete batching experience in concrete ready mix.
Vest in all aspects of concrete batching technology, equipment, methods and safety is required.
Working computer knowledge; including applicable Microsoft software.
Candidate must have excellent communication and organizational skills.
Must be able to handle multiple tasks in a fast paced environment.
Oversee all plant operations; coordinate and monitor daily work load throughout the plant; monitor plant cleanliness.
Oversee all electromechanical maintenance and mobilizing of the mobile concrete batch plant.
Ensure that all products meet 100% total quality requirements; take samples and test as necessary; ensure all equipment is working properly; complete all required reports timely and accurately; inform proper personnel of any quality problems that need resolving.
Maintain adequate levels of all supplies and products.
Maintain accurate and current reports as required.
Ensure that all company safety regulations and policies are followed at ALL times.
Ensure that all company environmental regulations and policies are followed.

Send all applications to hrm@proportionworks.com with subject as “Asphalt Batching Plant Foreman”

Apply via :

hrm@proportionworks.com