Technical Installer

JOB PURPOSEThe purpose of the Technical Installer position is to carry out day to day onsite task for the rough-in and trim phase of the project and to be the man on site during the delivery of a project. He is the staff that is always physically present on site. He is responsible to deliver the work plans and schedules provided for the Rough-in and Trim phase of customer project according to established Industry Standards.The Installer reports directly to the Project Systems Integrator. SPECIFIC JOB RESPONSIBILITIES

Resume work on site on a daily basis throughout project duration.
Running of all signal cables on site (cat6, coaxial, control cables, power cables etc.)
Coordinate piping for all company services as applicable to project
Ensure all cables are properly labeled according to the issued wire schedule.
Termination of all outlets and head-ends
Installation of all custom back boxes.
Trim out of all services.
Installation of speakers and trim out devices.
Ensure daily plans are followed and executed according to time and quality.
Ensures all installed device are properly managed and protected.
Ensures every task given by supervisor are completed within the given time frame.
Responsible for the management of On-site store.
Sends daily report to Project System Integrator.

QUALIFICATION AND EXPERIENCE

0-1 year work experience in AV Industry and a projectized environment
At least 1 year experience in IT Industry.
Minimum of OND in Electrical Engineering, Computer Science or Electrical Electronics Engineering.

REQUIRE SKILLS, KNOWLEGDE AND BEHAVIORAL CHARACTERISTICS

Spontaneous and able to manage change effectively.
A goal getter, always aiming to finish.
Uncomfortable with poor task delivery.
Always strives to be better.
Personable and easy to relate with; Rapidly establishing a good working relationship with other sub-contractor.
Passionate about growth, learning and development.
Ability to interpret project documentations which include drawings and Schedules.

KEY RESULT AREAS

Number of project not adhering to QC standards for rough-in and Trim Phase.
Number of projects phase closed within the standards of time and quality.
Percentage utilization and accountability of resources assigned  (work material)

Interested candidates should send their CV to hr@hausba.com

Apply via :

hr@hausba.com